   UHG Steel Structures

   The project department introduced lots of new techniques, equipments and technologies 

to complete the steel structures lifting operations of UHG CPP. According to the site needs

we invented a "steel structures lifting lugs", this method will not cause damage to the already 

installed steel products when  the piping and equipments being installed.This invention 

obtained the “patent certificate”issued by the state intellectual property office.

Bridge Lifting of Hecaogou Coal Mine In 2012,one of our great projects is that we successfully completed the bridge lifting 

from the main plant to the refined coal warehouse of the Hecaogou coal mine which 

has a total length of 198 m and a total weight of 350 tons.Rigging of the bridge is 

carried out by two steam cranes that loadbearing capacity of 300 tons.The construction 

difficulty lies in is adverse operating environment that the temperatures as low as -18 ℃.

Trestle Bridge Installation Dongtan Coal Mine

 This project is a part of Dongtan Coal Mine Construction of Shandong Yanzhou corporation, 

the teel trestle installation for the refuse dumpin system spans 62.7 meters, weight s 58 tons,

is the largest span bridge steel installed in the history by the end of 2009.

 

 Steel Structure Engineering of Ha Er Wu Su open-pit Coal

  The steel structure engineering of Ha Er Wu Su openpit Coal located in Zhun Geer was

completed in 2008.The project consists of five specimens of box type steel trestle bridge, 

color plate maintenance,grid and roof panel.This Steel trestle bridge has a  maximum span 

of 44.6 meters,lifting height of 39.2 m and weights140 tons, 

 

图片动画

 

China coal construction and installation engineering group co., LTD.All rights reserved
Address:Hebei HanDan Zip code:056002
Telephone:0310-7209571   E-Mail:zmjaxxb@126.com

 

 

XML 地图 | Sitemap 地图